Fig. 3: Matchmaking between GHG mitigation measures and energy infrastructure units.
From: Managing energy infrastructure to decarbonize industrial parks in China

PC, pure condensing; EC, extraction condensing; BP, back pressure; NGCC, natural gas combined cycle; CHP, combined heat and power; and MSW, municipal solid waste. M1–M5 work on their appropriate candidates in different capacities and technologies (framed on the left), by retrofitting or replacing them into the units shown on the right.