Fig. 4: Environmental benefits of GHG mitigation scenarios decomposed by different-sized units.
From: Managing energy infrastructure to decarbonize industrial parks in China

a–d present GHG mitigation potential, freshwater saving, SO2 emission reduction, and NOx emission reduction in M1–M5 and Integrated scenarios. M1, retrofitting coal-fired boilers to natural gas (NG)-fired boilers; M2, replacing coal-fired boilers with MSW incinerators; M3, retrofitting extraction-condensing or pure-condensing turbines to back-pressure turbines; M4, replacing small-capacity coal-fired units with large-capacity coal-fired units; and M5, replacing small-capacity coal-fired units with large-capacity natural gas combined cycle (NGCC) units; Integrated scenario, implementing M1–M5 jointly. Source data are provided as a Source Data file.