Fig. 7 | Scientific Data

Fig. 7

From: Hydrological model-based streamflow reconstruction for Indian sub-continental river basins, 1951–2021

Fig. 7

Flow duration curves at the upstream of the hydropower projects in India. (a,b), (c,d) Monthly flow duration curve for the Bhakra, Hirakud, Sardar Sarovar, and Mettur dams, respectively. The black dashed lines represent the threshold of high-flow (<5%) and low-flow (>95%) events. Map in the central panel shows the ___location of the selected hydropower dams across India.

Back to article page