Figure 18

Trend charts of large fragment rates for left and right holes at the entrance and exit of Lushan tunnel. (a) Import left hole. (b) Inlet right hole. (c) Exit left hole. (d) Exit right hole.
Trend charts of large fragment rates for left and right holes at the entrance and exit of Lushan tunnel. (a) Import left hole. (b) Inlet right hole. (c) Exit left hole. (d) Exit right hole.