Figure 4 | Scientific Reports

Figure 4

From: Study on the fracture propagation of ground fissures with syn-depositional structure in Fenwei Basin, China

Figure 4

Monitoring equipment layout diagram. (a) Preset fractured pvc sheets. (b) White ash line of soil. (c) Soil pressure monitoring equipment. (d) Optical fiber embedding process. (e) Surface displacement monitoring equipment. (f) Buried ___location diagram of various monitoring components. The bottom plate of the model box was 0 m thick, and the surface of the soil was 2.2 m thick.

Back to article page