Table 5 Selected geostress information after coordinate transformation.
Number | Drill hole number | Buried depth (m) | \(\sigma_{XX}\)(MPa) | \(\sigma_{YY}\) (MPa) | \(\sigma_{ZZ}\) (MPa) | \(\tau_{XY}\) (MPa) |
---|---|---|---|---|---|---|
1 | DZ-XCP-03 | 635.75 | − 15.56 | − 15.77 | − 16.81 | − 15.66 |
2 | DZ-XCP-03 | 690.65 | − 17.46 | − 17.46 | − 18.26 | − 17.46 |
3 | DZ-XCP-03 | 719.25 | − 17.85 | − 17.62 | − 19.01 | − 17.72 |
4 | DZ-XCP-03 | 761.85 | − 19.38 | − 18.93 | − 20.14 | − 19.11 |
5 | DZ-XCP-03 | 837.15 | − 20.28 | − 19.51 | − 22.13 | − 19.79 |