Table 4 Weights Derived from the Coefficient of Variation Method.
Evaluation Objective | Primary Indicator | Weight | Secondary Indicator | Weight |
---|---|---|---|---|
Changchun City’s Seismic Emergency Capability(A) | Mitigation Capability (B1) | 0. 229 | Monitoring and Warning Capability (B11) | 0. 061 |
Physical Seismic Resistance (B12) | 0. 060 | |||
Cultural Seismic Resistance (B13) | 0. 058 | |||
Regulatory and Policy Capability (B14) | 0. 059 | |||
Preparedness Capability (B2) | 0. 246 | Plan Formulation Capability (B21) | 0. 061 | |
Plan Drill Capability (B22) | 0. 063 | |||
Emergency Support Capability (B23) | 0. 072 | |||
Publicity and Education Capability (B24) | 0. 064 | |||
Response Capability (B3) | 0. 266 | Preliminary Disposal Capability (B31) | 0. 070 | |
Emergency Rescue Capability (B32) | 0. 063 | |||
Secondary Disaster Prevention and Control Capability(B33) | 0. 058 | |||
Government-Public Cooperation Capability(B34) | 0. 074 | |||
Recovery Capability (B4) | 0. 259 | Economic Capability(B41) | 0. 080 | |
Mobilization Capability(B42) | 0. 082 | |||
Administrative Capability(B43) | 0. 075 |