Table 1 Tunnel parameters.

From: Short-wall roadway backfill method for sustainable mining

Name of roadway

Cross-section form

Lane width/m

Lane height/m

Open-off cut

Rectangle

9.5

3.5

Main haulageway

Arch

5.6

4.2

Ventilation tunnel

Arch

5.4

4.3

Tramming drift

Arch

5.4

4.3

Ventilation roadway

Arch

4.0

3.5