Figure 7
From: Wavelet gated multiformer for groundwater time series forecasting

Predictions of 30 and 60 days for groundwater well P4 with (a, d) Wavelet Gated Multiformer, (b, e) Transformer, and (c, f) Autoformer with input size of 180 days, respectively.