Table 5 Index system of influencing factors of prefabricated building supply chain. This table categorizes the critical factors affecting the supply chain into a hierarchical index system. First-level indicators include component transport, procurement, planning, manufacturing, delivery and use, and external environmental factors. Each primary category is broken down into secondary indicators that specify the discrete elements like transportation company credit, cost of component transportation, and strategic planning accuracy, offering a detailed framework for analysis and improvement within the supply chain.

From: Analyzing resilience influencing factors in the prefabricated building supply chain based on SEM-SD methodology

First-level indicators

Categories

Secondary indicators

A1 Component transport process factors

A11

Transportation company credit

A12

Change of design drawings

A13

Component transportation cost

A14

Duration control

A15

Reasonableness of transportation standards

A2 Procurement process factors

A21

Warehousing expense

A22

Strategic planning accuracy

A23

Procurement price

A24

Product quality

A3 Planned factors

A31

Design scheme accuracy

A32

Project subcontracting

A33

Supply chain structure

A34

Information sharing

A4 Manufacturing process factors

A41

Production cost is too high

A42

Changes in the economic environment

A43

Low quality of raw materials

A44

Low production technology

A5 Delivery and use factors

A51

Performance capacity of the supplier

A52

Poor return and maintenance ability

A53

Unsatisfactory quality of acceptance

A6 External environmental factors

A61

Natural disasters

A62

Changes in market demand

A63

Changes in laws and policies