Fig. 10
From: Intelligent alarm system for river embankment seepage based on BILSTM

Prediction results of GRU model on the trend of water level change of piezometric tube at the YYL_1430_Z1 point. The blue, green and red lines represent the training, testing and predictive curves respectively.