Fig. 5
From: Intelligent alarm system for river embankment seepage based on BILSTM

Delay and correction results based on MI of the point of YYL_1430_Z1. (a) Time delay curve of YYL_1430_Z1. (b) Align the curve after correcting the delay.
From: Intelligent alarm system for river embankment seepage based on BILSTM
Delay and correction results based on MI of the point of YYL_1430_Z1. (a) Time delay curve of YYL_1430_Z1. (b) Align the curve after correcting the delay.