Table 9 Optimization scheduling results of scene 3 to 5.
Parameters | Scene 5 | Scene 6 | Scene 7 |
---|---|---|---|
The cost of CCPP/(yuan/day) | 2130613.31 | 2059584.28 | 2010762.88 |
The cost of natural gas/(yuan/day) | 1206693.14 | 1235802.93 | 1261545.69 |
The cost of P2G/(yuan/day) | 118183.90 | 113064.87 | 111041.50 |
The cost of carbon sequestration/(yuan/day) | 242879.43 | 239208.73 | 244564.25 |
The cost of carbon trading/(yuan/day) | − 867864.24 | − 860400.67 | -849616.93 |
The penalty cost of abandoning wind power and photovoltaic/(yuan/day) | 166510.36 | 126661.97 | 120369.74 |
The cost of energy storage power station/(yuan/day) | – | 166876.28 | 32212.06 |
Total cost/(yuan/day) | 2997015.90 | 3034703.05 | 2941603.63 |
LCOE/(yuan/kWh) | – | 0.6289 | 0.3079 |
Carbon emission/(t/day) | 3641.72 | 3470.58 | 3282.35 |
The rate of abandonment of wind power and photovoltaic/% | 8.98 | 6.75 | 6.41 |