Table 6 TOPSIS decision matrix.

From: A clustering-based co-allocation of battery swapping stations and wind-photovoltaic plants in radial distribution systems

Number of EVs

Vmin P.U

Criteria Profit k$

Loss kW

Renewable share %

\(N_{EV} = 200*3\)

0.955294

7973.0715

5.4146

30.786

\(N_{EV} = 240*3\)

0.950753

8642.9659

6.1833

26.1575

\(N_{EV} = 280*3\)

0.945129

9246.5992

7.4979

21.728

\(N_{EV} = 320*3\)

0.93366

9816.142

9.3807

18.3842

\(N_{EV} = 360*3\)

0.926327

10,356.7799

11.7467

15.7703

\(N_{EV} = 400*3\)

0.919273

10,889.7876

14.2384

13.6712