Table 5 CPT of node T.
From: Reliability analysis of subsea pipeline system based on fuzzy polymorphic bayesian network
Y1 | Y2 | T | ||
---|---|---|---|---|
0 | 0.5 | 1 | ||
0 | 0 | 1 | 0 | 0 |
0 | 0.5 | 0.2 | 0.4 | 0.4 |
0 | 1 | 0 | 0 | 1 |
0.5 | 0 | 0.5 | 0.3 | 0.2 |
0.5 | 0.5 | 0.1 | 0.3 | 0.6 |
0.5 | 1 | 0 | 0 | 1 |
1 | 0 | 0 | 0 | 1 |
1 | 0.5 | 0 | 0 | 1 |
1 | 1 | 0 | 0 | 1 |