Fig. 3: Each role of IOD model parameters in decadal changes of IOD seasonal synchronization.

Timeseries of DMI peak month obtained from the control experiment (black line), the constant φl experiment (red line), and the non-ENSO-forcing experiment (βmE(t); blue line). DMI peak month is determined over 30-year moving band by computing DMI variance for each calendar month for each band.