Fig. 10
From: Scheduling optimization of ship plane block flow line considering dual resource constraints

Gantt chart of the optimal scheduling scheme.
From: Scheduling optimization of ship plane block flow line considering dual resource constraints
Gantt chart of the optimal scheduling scheme.