Fig. 7

Effect of BA powder replacement rate, water-cement ratio and sand-cement ratio on setting time of AASM (Note: The initial and final setting times of group N were 153 and 237Â min, respectively.)
Effect of BA powder replacement rate, water-cement ratio and sand-cement ratio on setting time of AASM (Note: The initial and final setting times of group N were 153 and 237Â min, respectively.)