Table 10 Process plan of the IVNs.
Tasks of IVN | Machine | Processing time | Tasks of IVN | Machine | Processing time |
---|---|---|---|---|---|
O11 (Electrical performance test) | M4 | 10 | O42(High temperature functional test) | M3 | 13 |
O12 (Button operation force test) | M7 | 12 | O43 (Low temperature exposure test) | M6 | 17 |
O21 (Dimensional inspection) | M2 | 14 | O44 (Low temperature functional test) | M8 | 17 |
O22 (Rapid thermal cycling test) | M3 | 19 | O45 (Humidity and temperature cycling Test) | M7 | 19 |
O23 (Key operation durability test) | M4 | 13 | {O37, O46}(Dust test) | M1 | 15 |
{O13, O24}(Drop impact test) | M3 | 18 | O51 (Appearance function test) | M5/ M8 | 15/15 |
O31 (Static current test) | M1 | 12 | O61 (Conductive emission test) | M7 | 17 |
O32 (Operating voltage range test) | M1 | 15 | O62 (Radiated emission test) | M8 | 18 |
O33 (Alcohol screening) | M2 | 17 | O63 (Radiated immunity test) | M3 | 15 |
O34 (Fuel injector adhesion point inspection) | M5 | 17 | O64 (Electrostatic discharge test) | M3 | 16 |
O35 (Artificial sweat test) | M6 | 19 | O65 (Temperature cycling test) | M6 | 16 |
O36 (Swabbing test) | M2 | 12 | O71 (Lifetime testing) | M5/M8 | 16/16 |
O41(High temperature exposure test) | M4 | 15 |