Table 11 Process plan of the UAVs.

From: An enhanced walrus optimization algorithm for flexible job shop scheduling with parallel batch processing operation

Tasks of IVN

Machine

Processing time

Tasks of UAVs

Machine

Processing time

O11 (High-low temperature charge–discharge test)

M1

17

O31 (Key/Button test)

M4

18

O12 (High-low temperature flight test)

M8

14

O32 (Transportation vibration Test)

M6

17

O13 (Swelling rainfall test)

M4

15

O33 (Handling Test)

M2

19

O21 (Corrosion resistance test)

M2

10

O34 (Circuit bending test)

M5/M8

12/12

O22 (Maximum load aging test)

M5

19

O41(Battery insertion and removal test)

M2

14

O23 (Spraying aging test)

M3

16

O42(Six-sided drop test)

M7

12

{O14, O24}(drop impact test)

M2

10

O43 (Dustproof test)

M1

17

   

O44 (Immersion water test)

M6

15