Fig. 2 | Scientific Reports

Fig. 2

From: A molecular specimen bank for contemporary and future study captures landscape-scale biodiversity baselines before Klamath River dam removal

Fig. 2

Images of before and after dam removal on the Klamath River. (A1) Upstream view of the Iron Gate Reservoir below Fall Creek, prior to the start of reservoir drawdown and dam removal, beginning of January 2024 (Photo credit: resource environmental solutions (RES)). (A2) Same ___location as (A1), now an upstream view of the Klamath River below Fall Creek, taken within the former Iron Gate Reservoir footprint, May 2024 (Photo credit: RES). (B1) Drone image of the Copco 1 Dam, completed in 1918, along the Klamath River during pre-dam removal activities in September 2023 (Photo credit: RES). (B2) Drone image of the Klamath River at the former Copco 1 Dam site following the completion of dam removal activities in October 2024 (Photo credit: RES).

Back to article page